词语吧>英语词典>cable length翻译和用法

cable length

英 [ˈkeɪbl leŋθ]

美 [ˈkeɪbl leŋθ]

链(英国608英尺,美国720英尺);电缆长度;线长;电线长度

英英释义

noun

双语例句

  • Simulative calculation of cable pre-tension and calculation of unstressed cable length in flexible pre-stress structure
    预应力柔性结构中拉索预张力模拟的迭代算法和无应力索长的计算
  • The basic theory of control method of unstressed cable length is illustrated. And this control method is employed for adjustment hanger force of self-anchored suspension bridge, order to conform with require of design.
    阐述了无应力索长控制法的基本理论,并采用该控制方法调整自锚式悬索桥吊杆的内力值,使之符合设计要求。
  • And then the effect of the change of cable length and span and the redistribution of dead load due to deformation on cable curve are analyzed.
    分析了索长变化、跨度变化及主缆变形引起的恒载重分布对主缆线形的影响。
  • In this paper, to avoid the current-contact measurement of the drawbacks, a laser Doppler Effect based on the non-contact cable length measurement is used.
    本文针对现行接触式测量所存在的弊端,采用了一种基于激光多普勒效应的非接触式电缆长度测量方法。
  • Analysis on Calculation Precision the Cable Length
    悬索索长计算精度分析
  • However, the issue of measuring precision in the wire and cable market becomes more and more prominent. It is significant to measure the cable length precisely, rapidly and economically.
    然而,目前电线电缆市场上存在的计量问题日臻突出,如何准确、迅速、经济的实现对电缆长度的测量,具有重要的理论意义和研究价值。
  • The principle error of the TDR cable length measurement has also been analyzed. The influence of measuring numbers, counting pulse frequency and traveling wave velocity on measuring accuracy is analyzed.
    分析了时域反射电缆测长的原理误差,研究了测量次数、计数脉冲频率、行波波速对测量精度的影响。
  • As a kind of pre-stressed structures, the most important factor of the deviation of the initial shape and initial pre-tension of cable-strut tensile structures is the member length error ( cable length error and strut length error, hereinafter referred to as "length error").
    作为一类预应力结构,构件长度误差(即索长和杆长误差,以下简称为长度误差)是造成索杆张力结构初始形态和初始预张力偏差的最主要因素。
  • It is important for the cable length to be suitable for the depth of the hole concerned.
    脚线的长度要适应于炮眼的深度,这一点是很重要的。
  • Place the units in their intended mounting locations to check the cable length and monitor installation conditions.
    把设备放入计划好的安装位置,检查电缆长度和监视器安装条件。